Skip to content
Independent China procurement deskStart a specification brief
American Racing Procurement Desk
Verification and coordination

American Racing Procurement Services

A drawing, a size list or an OE cross reference can start the review. We coordinate supplier quotations, samples, inspection and shipment paperwork for an agreed set of parts.

Illustration of an alloy wheel and dimensional drawing prepared for review

Four parts of a sourcing review

RFQ clarification

Confirm center bore, wheel offset (ET), brake envelope and finish. Record open items beside the buyer drawing.

Quote comparison

Separate tooling, unit cost, sample fees, packing and the named Incoterm. Match each line to a SKU and revision.

Sample and inspection

Coordinate trial fit and an agreed inspection. Confirm who will record radial runout, lateral runout and any finish exceptions.

Shipment file

Reconcile SKU labels, carton counts, gross weights and destination instructions before goods are handed to the carrier.

Illustrative procurement scenarios

Where quotation assumptions diverge

Illustration of a sample wheel at a brake-clearance review station

Stock replenishment or a custom offset

Consider a distributor comparing a stock wheel and a custom ET35 option. Ask for the same wheel load rating and brake envelope in both offers. The stock quote can simplify replenishment if clearance and finish match. A custom quote should separate tooling and sample timing from the production schedule.

Illustration of separately labeled wheel cartons for consolidation

One source or a mixed-supplier shipment

Consider a catalog program that needs several bolt patterns. One source can simplify the approval file. Multiple sources may cover more fitments, but each needs a separate sample and label check. Group cartons by supplier lot so an inspection discrepancy can be traced before loading.

Who signs off

  • 01Buyer approves the specification and samples
  • 02Supplier confirms production and quote scope
  • 03Inspector reports against the agreed checklist

Send the specification you need quoted

Include expected quantities and the destination port. If you have a sample identifier or drawing revision, add it to the notes.